For New Applications and Existing Process Optimization The Flotation Feasibility Assessment is a thorough, on-site, evaluation that determines the treatability of a wastewater or process stream. Although this study uses the Dissolved Air Flotation (DAF) process for separating product or contaminants from a wastewater stream, the information generated is useful for evaluating other processes as well. An on-site study assures that tests are conducted on representative and fresh samples collected when required to take into account waste stream variations due to product or process changes, sanitation operations, etc. The tests are conducted in accordance with established procedures coupling jar testing techniques with a separation step performed in a Bench Scale Flotation Apparatus. The results from this work provide a valid prediction of full scale flotation system performance. The information applies to the design of high performance flotation systems and can also be used for Upgrading and Optimizing the performance of existing clarification systems. FAQs addressed by the Feasibility Assessment include:
In most cases, the Feasibility Assessment results in recommendations that can be applied directly to treatment system design. All of the equipment and chemicals required for the test work will be provided. The customer's responsibility is limited to the following:
Fee, Reporting, and Schedule: Typically a minimum of two (2) days on-site are required to complete the work. Consulting Labor for site work is provided on an application specific daily rate basis. The client also pays all travel and living expenses incurred to complete the work. Labor and expenses usually run about $2,500 - $5,500 which covers travel time and report preparation in most cases. Report preparation and follow-up work is prorated at $100.00/Hr. The client also arranges and pays directly for analytical services. A concise Report of Findings will be issued which will include conclusions and recommendations for meeting the client's objective. The report is usually issued within two weeks of receiving analytical results. Service can usually be scheduled with two weeks notice upon receipt of a Purchase Order or letter of intent. The Scope of Work offered in a Feasibility Assessment is tailored to meet specific facility objectives. Additional time may be required. To inquire about an application, please call:
|
![]() |
30 Pinewood Place Asheville, NC 28806 USA | 828.505.0241 |