Southern Appalachian Coal Bed Methane (CBM) Produced Water Treatment In 2006, Ecosa, along with its alliance partner, HMI Systems, Inc. provided extensive services on a multimillion dollar CBM Produced Water Treatment System project in Central Alabama. The treatment train included two physical/chemical treatment operations and associated solids handling followed by three stage membrane filtration. |
20 Ft. Ø Stainless Steel Nautilus Flotation Unit .s Flotation Treatment Train |
Ecosa Contributions: Feasibility Assessment Services Designed, Built, Delivered, and Installed a 20,000 BPD (~ 1 MGD) Nautilus Nucleation Flotation System with Two Stage Flocculator. Two Stage Flocculator—Stainless Steel |
Manufactured, Delivered, and Erected a Dewatering Platform with 3 Filter Presses. |
Elevated Dewatering Station |
Manufactured multiple Containerized Chemical Preparation and Metering Process Modules for Coagulants, Flocculants, Antiscalants, various Membrane Cleaning Reagents, and Filter Press Pre-coat and Body Feed systems. |
Module 8—Membrane Cleaning Reagents Module 8—Control Valve Gallery |
Flocculant Systems |
Module 10—Treatment Chemicals & Dewatering Aids Module 10—Exterior |
![]() |