Project Highlight

Southern Appalachian Coal Bed Methane (CBM) Produced Water Treatment

In 2006, Ecosa, along with its alliance partner, HMI Systems, Inc. provided extensive services on a multimillion dollar CBM Produced Water Treatment System project in Central Alabama.  The treatment train included two physical/chemical treatment operations and associated solids handling followed by three stage membrane filtration.

20 Ft. Ø Stainless Steel Nautilus Flotation Unit .s

20 Ft. Ø Stainless Steel Nautilus Flotation Unit .s

Flotation Treatment Train

Flotation Treatment Train

Ecosa Contributions:

Feasibility Assessment Services

Designed, Built, Delivered, and Installed a 20,000 BPD (~ 1 MGD) Nautilus Nucleation Flotation System with Two Stage Flocculator.

Two Stage Flocculator—Stainless Steel

Two Stage Flocculator—Stainless Steel

 

Manufactured, Delivered, and Erected a Dewatering Platform with 3 Filter Presses.

Elevated Dewatering Station

Elevated Dewatering Station

Manufactured multiple Containerized Chemical Preparation and Metering Process Modules for Coagulants, Flocculants, Antiscalants, various Membrane Cleaning Reagents, and Filter Press Pre-coat and Body Feed systems.

Module 8—Membrane Cleaning Reagents

Module 8—Membrane Cleaning Reagents

Module 8—Control Valve Gallery

Module 8—Control Valve Gallery

Flocculant Systems

Flocculant Systems

Module 10—Treatment Chemicals & Dewatering Aids

Module 10—Treatment Chemicals & Dewatering Aids

Module 10—Exterior

Module 10—Exterior